Skip to page body Home About Us Government Departments Doing Business Services I Want To...

Mobility Projects
Precinct 3

 

Expand All / Contract All

Sugar Land-Howell Road - 13211
A:

Precinct 2 & 3

Limits: Bissonnet Road to Old Richmond Road - [MAP]

Length (ft): 3500

Description: Widen the existing two-lane asphalt road to a three-lane concrete road between Bissonnet Road and Old Richmond Road.

Benefit: This project will improve safety by eliminating the existing roadside ditches and replacing with a curbed road with underground drainage. It will improve mobility between Bissonnet and Old Richmond Road by providing a left turn lane that will allow traffic to flow smoothly.

Bond Amount: $4,500,000

Total Project Cost: $4,500,000

Katy Gaston - 733A
A:
Precinct 3

Limits: Connect to FM 1093 - [MAP]

Description: Pipeline/Utility relocation: CPE 4” gas line being relocated.

Bond Amount: $1,300,000

Total Project Cost: $1,950,000
FM 1463 [Segment 1] - 13308
A:

Precinct 3

Limits: IH 10 to Spring Green - [MAP]

Length (ft): 5400

Description: Reconstruct FM 1463 to a four-lane concrete road between IH-10 and Spring Green.

Benefit: This project will reduce congestion by adding additional lanes.

Bond Amount: $1,600,000

Total Project Cost: $8,500,000

36-A Coalition - 13301
A:

Precinct 3

Limits: West Fort Bend County

Length (ft): N/A

Description: Conduct a study to determine a route for a new thoroughfare to connect US 59 to IH-10.

Benefit: This new route will improve north/ south mobility in Fort Bend County.

Bond Amount: $500,000

Total Project Cost: $500,000

Bellaire Boulevard - 13302
A:

Precinct 3

Limits: Drainage Ditch (Sierra Bend) to Parkway Lakes Ln - [MAP]

Length (ft): 3000

Description: Construct a four-lane concrete boulevard between Parkway Lakes Lane and Sierra Bend Drive.

Benefit: This project will fill in the gap between segments of road previously completed.

Bond Amount: $1,800,000

Total Project Cost: $1,800,000

Bellaire Boulevard - 13303
A:

Precinct 3

Limits: Lakemont Bend Ln to Sierra Bend Dr - [MAP]

Length (ft): 1700

Description: Construct a four-lane concrete boulevard between Lakemont Bend Lane and Sierra Bend Drive.

Benefit: This project will fill in the gap between segments of road previously completed.

Bond Amount: $2,100,000

Total Project Cost: $2,100,000

Bellaire Boulevard - 13304
A:

Precinct 3

Limits: Lakehead Ln to S. Mason Rd - [MAP]

Length (ft): 2400

Description: Construct remaining two-lanes of concrete roadway to complete the four-lane boulevard between Lakehead Lane and South Mason Road.

Benefit: This project will improve mobility and decrease congestion by adding travel lanes.

Bond Amount: $2,800,000

Total Project Cost: $3,800,000

Brandt Lane - 13305
A:

Precinct 3

Limits: Skinner Road to Mason Road - [MAP]

Length (ft): 2100

Description: Construct a two-lane asphalt road with shoulders to replace the existing asphalt road with no shoulders.

Benefit: This project will improve safety by adding shoulders.

Bond Amount: $1,350,000

Total Project Cost: $1,350,000

Cane Island Boulevard - 13306
A:

Precinct 3

Limits: North side of Willow Fork to FM 1463 - [MAP]

Length (ft): 2300

Description: Construct two lanes of a concrete road between Willow Fork and FM 1463. The project will include a new bridge and channel improvements to reduce flooding.

Benefit: This project will provide a new connection from FM 1463 to a new overpass interchange on I-10.

Bond Amount: $6,800,000

Total Project Cost: $6,800,000

Crossover Road [Segment 1] - 13307
A:

Precinct 3

Limits: FM 1463 to Katy Flewellen (Spring Green) - [MAP]

Length (ft): 11600

Description: Construct two lanes of a concrete road between FM 1463 and Katy Flewellen Drive.

Benefit: This project will improve mobility and decrease congestion.

Bond Amount: $2,650,000

Total Project Cost: $3,300,000

Fulshear Parkway - 13309
A:

Precinct 3

Limits: I-10 to 2,500' south of FM 1093 - [MAP]

Length (ft): 33000

Description: Construct a new four-lane concrete road between FM 1093 and IH-10.

Benefit: This project will improve mobility by adding a new, major north/ south corridor to connect FM 1093 to IH-10.

Bond Amount: $4,500,000

Total Project Cost: $47,000,000

Gaston Road [Segment 1] - 13311
A:

Precinct 3

Limits: Greenbusch to Katy Flewellen - [MAP]

Length (ft): 8200

Description: Construct a new four-lane concrete boulevard between Greenbusch and Katy Flewellen Drive.

Benefit: This project will improve mobility and decrease congestion.

Bond Amount: $9,100,000

Total Project Cost: $9,100,000

Gaston Road [Segment 2] - 13310
A:

Precinct 3

Limits: Katy Flewellen to Spring Green - [MAP]

Length (ft): 2600

Description: Construct a new four-lane concrete boulevard between Spring Green and Katy Flewellen Drive.

Benefit: This project will improve mobility and decrease congestion.

Bond Amount: $3,100,000

Total Project Cost: $4,750,000

Greenbusch - 13312
A:

Precinct 3

Limits: Gaston to Westheimer Pkwy - [MAP]

Length (ft): 6900

Description: Construct a four-lane concrete road with a new bridge between Gaston Road and Westheimer Parkway.

Benefit: This project will improve mobility and decrease congestion.

Bond Amount: $7,400,000

Total Project Cost: $7,400,000

Huggins Drive - 13313
A:

Precinct 3

Limits: FM 359 (Main St) to Katy Fulshear - [MAP]

Length (ft): 3300

Description: Construct a new two-lane asphalt road with shoulders between FM 359 and Katy Fulshear Road.

Benefit: This project will provide improved mobility around the City of Fulshear.

Bond Amount: $2,500,000

Total Project Cost: $2,500,000

IH-10 East Frontage Road - 13314
A:

Precinct 3

Limits: 2400' East of FM 1463 to 2500' West of I-10 Pin Oak Rd Entrance Ramp - [MAP]

Length (ft): 4700

Description: Add turn lanes on the IH-10 eastbound frontage road at FM 1463.

Benefit: Add turn lanes on the IH-10 eastbound frontage road at FM 1463.

Bond Amount: $400,000

Total Project Cost: $2,600,000

IH-10 West Frontage Road - 13315
A:

Precinct 3

Limits: 800' West of Pin Oak Rd to 1650' East of FM 1463 - [MAP]

Length (ft): 1300

Description: Add turn lanes on the IH-10 westbound frontage road at FM 1463.

Benefit: This project will decrease congestion at the intersection of FM 1463 at IH-10

Bond Amount: $200,000

Total Project Cost: $2,000,000

Katy Flewellen Road [Segment 1] - 13316
A:

Precinct 3

Limits: Gaston Rd to Roundabout (Crossover Rd) - [MAP]

Length (ft): 2700

Description: Construct a four-lane concrete boulevard between Gaston Road and Spring Green Drive.

Benefit: This project will complete a connection of Katy Flewellen to Spring Green Boulevard and will improve regional mobility in the Katy area.

Bond Amount: $3,400,000

Total Project Cost: $3,600,000

Katy Fulshear Road - 13317
A:

Precinct 3

Limits: FM 1093 to Huggins Dr - [MAP]

Length (ft): 2400

Description: Construct a four-lane concrete boulevard between FM 1093 and Huggins Drive.

Benefit: This project will provide improved mobility around the City of Fulshear.

Bond Amount: $3,300,000

Total Project Cost: $3,450,000

Spring Green Boulevard - 13318
A:

Precinct 3

Limits: Avalon at Katy to Hawks Prairie Blvd. - [MAP]

Length (ft): 5300

Description: Construct a new four-lane concrete boulevard including a round-about at the intersection of Spring Green and Crossover Drive.

Benefit: This project will extend Spring Green Drive and fill in the gap to create a continuous thoroughfare between Westpark Tollway and IH-10.

Bond Amount: $2,500,000

Total Project Cost: $11,900,000

1 2

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Flash Player Download QuickTime Download Windows Media Player Download AutoDesk DWF Viewer Download Microsoft Silverlight Download Word Viewer Download Excel Viewer Download PowerPoint Viewer