Precinct 1

Limits: Compton Street to Brisco Canal - [MAP]

Length (ft): 3900

Description: Construct four-lane concrete street with curbs to replace the existing asphalt and gravel road with open ditches.

Benefit: This project will improve safety by eliminating the deep roadside ditches and improve drainage by constructing an underground storm sewer system.

Bond Amount: $2,800,000

Total Project Cost: $2,800,000