SH-99 Project

Where: 
The pre-recorded video presentation (in English and Spanish) will be posted below and all materials are available separately under the Downloads section.
 
When:
The pre-recorded presentation will go live Tuesday, October 3 by 5 p.m.
 
Purpose:
The purpose of the virtual public meeting is to present the proposed project to the public and receive comments proposing improvements along SH 99 between Highland Knolls/Bay Hill Boulevard and South Fry Road in Fort Bend County, Texas. The virtual meeting will consist of a narrated presentation by the project team, project exhibits and other information, and an opportunity to comment.
 

Description:
The proposed project would add continuous two-lane frontage roads along sections of SH 99 between Highland Knolls/Bay Hill Boulevard and South Fry Road in Fort Bend County, Texas. A section of frontage road would be constructed along SH 99 northbound from South Fry Road to Highland Knolls/Bay Hill Boulevard. Two additional sections of frontage road would be constructed along SH 99 southbound from (1) Highland Knolls/Bay Hill Boulevard to Cinco Ranch Boulevard and then (2) from Westheimer Parkway to South Fry Road. The proposed frontage roads, approximately three miles in length, would also include adjustments of ramp access locations, curb and gutter with storm sewer, and would provide an 8 to 10-foot-wide continuous shared-use path to accommodate bicycles and pedestrians. This proposed project’s shared use path would connect with the existing shared-use path from Highland Knolls/Bay Hill Boulevard to South Fry Road.

English Presentation:

 

Spanish Presentation:

 

Special Accommodations:
The public meeting will be conducted in English and Spanish. If you need an interpreter or document translator because English or Spanish is not your primary language or you have difficulty communicating effectively in English or Spanish, one will be provided to you free of charge. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the public meeting, and please contact Gabriel Adame, NEPA public engagement coordinator, at (713) 802-5199 or Gabriel.Adame@txdot.gov no later than 4 p.m., Thursday, Sept 28, 2023. Please be aware that advance notice is required as some services and accommodations may require time for the project team to arrange.
 
Memorandum of Understanding:
The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by FHWA and TxDOT.
 
Downloads:

Contact:
Matt Billiot, P.E.
1710 Seamist Dr.
Houston, Texas 77008
(713) 869-3433
sh99fr@binkleybarfield.com