SH-99 Project
Where:
The pre-recorded video presentation (in English and Spanish) will be posted below and all materials are available separately under the Downloads section.
When:
The pre-recorded presentation will go live Tuesday, October 3 by 5 p.m.
Purpose:
The purpose of the virtual public meeting is to present the proposed project to the public and receive comments.s proposing improvements along SH 99 between Highland Knolls/Bay Hill Boulevard and South Fry Road in Fort Bend County, Texas. The virtual meeting will consist of a narrated presentation by the project team, project exhibits and other information, and an opportunity to comment.
Description:
The proposed project would add continuous two-lane frontage roads along sections of SH 99 between Highland Knolls/Bay Hill Boulevard and South Fry Road in Fort Bend County, Texas. A section of frontage road would be constructed along SH 99 northbound from South Fry Road to Highland Knolls/Bay Hill Boulevard. Two additional sections of frontage road would be constructed along SH 99 southbound from (1) Highland Knolls/Bay Hill Boulevard to Cinco Ranch Boulevard and then (2) from Westheimer Parkway to South Fry Road. The proposed frontage roads, approximately three miles in length, would also include adjustments of ramp access locations, curb and gutter with storm sewer, and would provide an 8 to 10-foot-wide continuous shared-use path to accommodate bicycles and pedestrians. This proposed project’s shareduse path would connect with the existing shared-use path from Highland Knolls/Bay Hill Boulevard to South Fry Road.
English Presentation:
Spanish Presentation:
Special Accommodations:
Fort Bend County makes every reasonable effort to accommodate the needs of the public. The virtual public meeting materials and exhibits will be in English and Spanish. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call the Fort Bend FM 521 Project Manager at (713) 869-3433 no later than 4:00 p.m. on Thursday, June 10, 2021, to request special accommodations. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.
Memorandum of Understanding:
The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by FHWA and TxDOT.
Downloads:
Contact:
Kevin Mineo
1710 Seamist Dr.
Houston, Texas 77008
(713) 869-3433
FBCProject-FM521South@binkleybarfield.com